PBS NOC DDMS Cutover – Maintenance Window

Scheduled for Apr 2, 23:00 PDT  -  Apr 3, 02:00 PDT

Scheduled

On Thursday, April 3rd, from 2:00 AM- 5:00 AM ET (11:00 PM – 2:00 AM PT), the Edisen Support Team will coordinate a circuit cutover work session at PBS NOC.

During the work session, all national linear terrestrial services contributed by the NOC will be unavailable for a period ranging from 5 minutes to the full duration (3-hours) of the maintenance window.

The following TERRESTRIAL linear streams will be impacted:

PBS-01 (NPS-East)
PBS-02 (NPS-West)
PBS-03 (PBS Kids)
PBS-04 (HD-64 contribution stream) – Unallocated during maintenance window
PBS-05 (HD-65 contribution stream) – Unallocated during maintenance window
PBS-06 (HD03)

Stations may plan to switch away from the affected terrestrial streams (to the corresponding satellite streams, or to alternative programming) during this period until the all-clear is issued. The Maintenance Window will be completed, and normal service should resume no later than 5:00 AM ET (2:00 AM PT).
Posted Mar 31, 2025 - 10:26 PDT
This scheduled maintenance affects: sIX MagnuBoxes (Terrestrial), sIX Live Linear Streaming (Terrestrial), sIX HD-64 Linear Stream, sIX HD-65 Linear Stream, and sIX National Streams.